Coating over a sound membrane
The usual case: a membrane that is intact and dry, which takes a coating after a clean and a seam check.
Cleaning, repairing and coating a low-slope roof surface so the sun has less effect on the membrane, with the surface prepared and the coating matched to what is underneath.
Fastest: call (833) 751-2102. Or send this and we call you back.
A low-slope roof coating is a liquid layer applied over a cleaned and repaired roof surface to reflect sunlight and slow the ageing of the membrane below. It is only as good as the preparation, so the surface is cleaned, its seams and blisters are repaired and a test patch is checked for adhesion before the coating goes on across the roof.
Sun is the wear that a flat roof in San Diego sees most of the year. A membrane in full sun heats and cools daily, and the surface can lose its flexibility and begin to craze. A coating reflects some of that sun and gives the membrane a protective layer against the wear it takes from the sky.
Beachside blocks in Pacific Beach and the open flats of the inland valleys both get long hours of direct sun, and the fact sheet records sun exposure as a roofing factor on the beachside blocks. A coating is one of the options for a flat roof in either setting, if the membrane below is sound enough to take it.
Call (833) 751-2102 to ask for a roof check. A coating is not the right answer for a membrane that is split, ponding or past its life, and the technician will say so if that is the case.
Coatings and their solvents can irritate the skin and the lungs. Work in ventilated air, wear the gloves and mask the product data sheet requires, and keep children and pets off the roof while the coating is wet. Do not use an open flame near the solvent.
The membrane is cleaned of dust, moss and residue, and any standing water is removed. The coating will not bond to a wet or dirty surface, so the drying is checked with a meter before the next step.
Open seams, blisters and small splits are repaired before any coating is applied, because a coating over a split only hides the leak until it is found.
A test area is primed and coated and left to cure, then pulled and checked for adhesion. The result decides whether the full coating goes on, and the test is written into the record.
The coating goes on in two passes at the rate the manufacturer requires, with the second pass at right angles to the first. The roof is checked for thin areas and for any spot where the coating has pooled.
The product name, the coverage rate, the cure time and the date are written on the scope and kept with the building file. A later re-coat or repair can then be matched to what is already on the roof.
A coating protects the membrane from sun and weather at the surface. It does not repair a split, a blister or a failed deck, and it does not stop ponding water from standing on the roof.
The coating is a layer on top of the membrane. If the membrane below is cut, blistered or stretched, the coating will bridge the surface but not the fault. That is why the repair comes first.
A coating also changes how the roof reacts to temperature. A dark membrane in full sun can run very hot at midday, and that heat expands the sheet and then lets it contract as the evening cools. A reflective surface reduces the peak temperature and the size of that daily movement, which is one of the reasons it is used on sunny flats. The benefit is real but modest, and it works best on a membrane that is already sound.
Dust, moss and residue stop the coating from bonding. A surface that looks clean from the ground can be coated with a film of dust that causes the coating to peel within a season.
The cleaning is a planned step. The technician uses the product the manufacturer names, rinses the surface and checks the drying time before the coating is applied.
Wet membrane also prevents bonding, so the drying is measured. Only a dry, clean surface gets the first pass.
The surface is also checked for old coatings. A roof that was coated before may carry a layer that is peeling or chalky, and a new coating on top of a failed one will fail with it. The technician scrapes a small area to see whether the old layer is bonded or loose. Where it is loose, it is removed before the new coating is applied, and the removal is recorded on the scope so the owner knows what was taken off.
The timing of the work also matters. A coating is applied in mild, dry weather, and the surface must stay dry for the cure. Heat that is too high can blister the coating before it sets, and rain before the cure can wash it off. The technician plans the date around the forecast and records the conditions on the day, so the owner knows the coating had the weather it needed.
The coating must suit the membrane type, because a product that bonds to one material may not bond to another. The technician checks the membrane and the coating's compatibility before any work is booked.
A coating that is not compatible can lift in sheets after a hot summer, which is a costly failure. The test patch is the check that prevents it.
The owner is shown the product data and the manufacturer's requirements for the membrane, so the choice is documented before the coating is ordered.
The thickness of the coating is also controlled. A coating applied too thin does not give the reflectance or the protection the product sheet describes, and one applied too thick can crack as it cures. The technician measures the wet film during the work and checks the rate against the product data, so the finished layer matches the requirement the product states.
A coating also suits some roofs better than a full covering replacement, and it is worth considering when the membrane is sound and the owner wants to extend its life for a few years. The decision is made against the age of the membrane and the cost of the alternative, and the technician sets out both on the scope so the owner can choose.
The usual case: a membrane that is intact and dry, which takes a coating after a clean and a seam check.
A coating laid with a fabric reinforcement at the seams and edges, where the membrane has begun to crack along those lines.
A roof that was coated and has begun to chalk or craze can be re-coated after cleaning and a seam check. It is a shorter job than the first coating, but the surface still has to be tested for adhesion before the full area is covered.
Pacific Beach is an oceanfront neighborhood north of Mission Bay, and the beachside roofs there are checked for sun wear before a coating is proposed.
The inland valleys get the same long hours of direct sun, so a low-slope coating is also considered in the inland part of the city.
A coating decision is made with the building's age and the membrane's condition in view, not on a general view of the neighborhood.
A flat roof in the inland valleys is worked in the cooler part of the day for the coating, since the membrane is hottest at midday and the product sets poorly on a surface that is too warm.
Tell us when you need someone and we book the earliest visit a low-slope roof coating technician has, and you approve the price before any work starts.
Not sure if you're covered? Check your ZIP code.
Seam, blister and drain repairs on flat and low-slope membranes, with the ponding areas measured and the membrane tested before the crew leaves.
Full re-roofing of multi-unit buildings, with the phasing, access and protection of occupied units planned in writing before any covering is removed.
Tracing a roof leak back from the ceiling stain to the place water enters, with photographs and moisture readings kept for the repair and any claim.
A line-by-line scope for any roof job in San Diego, with the licence, the workers' compensation cover and the insurance certificate checked before work begins.
It can slow the ageing of a sound membrane by reducing sun wear at the surface. It cannot restore a membrane that is already failing, and the technician will not promise a set period of life.
It reflects more sunlight than a dark membrane, so the surface often runs cooler. The effect on the rooms below depends on the insulation and ventilation of the building.
It must be dry, intact and free of ponding. The technician checks those three things, tests a patch and then says whether a coating is the right choice.